Heating and cooling system cleaning for pharmaceutical sites
Clean, well-treated heating and cooling water for GMP sites, with the planning, method statements and records your quality and engineering teams expect.
On a pharmaceutical site, the heating and cooling systems behind your HVAC and process utilities have to perform consistently, and any work on them has to fit your site's procedures. TMG Plumbing & Heating Services are plumbers and heating contractors who clean, filter and treat closed heating and cooling loops for commercial and industrial sites across Ireland, planning the work around your shutdowns and supplying the documentation to support it.
What a GMP site needs from a contractor
Heating and chilled-water loops feed air handling units, clean-room HVAC and process equipment. Sludge, magnetite and scale in those loops reduce heat transfer, foul heat exchangers and strainers, and make temperature control harder to hold. On a regulated site, the contractor working on them matters as much as the result.
We work to your site's rules. Work is scoped in advance, method statements and risk assessments are submitted for approval, and nothing changes on a system without going through your change control. When the job is finished you receive a written record of what was done, with water-quality results before and after.
Signs your heating or cooling loops need attention
- Air handling units or process equipment struggling to hold temperature
- Heat exchangers, strainers or control valves fouling more often
- Dirty, discoloured or cloudy system water
- Water results drifting out of the limits set by your equipment manufacturers
- Pumps, valves or plate heat exchangers failing or needing more maintenance
- Higher energy use for the same load
How we plan and carry out the work
- 1
Survey and scoping
We review system schematics, volumes, isolation points and access with your engineering team, and agree the scope, working hours and any shutdown window.
- 2
Documentation for approval
We prepare a method statement, risk assessment and work plan for your review, and complete your site induction and permit-to-work process before starting.
- 3
Baseline water sampling
Samples are taken from agreed points and analysed for pH, conductivity, hardness, corrosion products and suspended solids, so there is a clear starting point.
- 4
Filtration and cleaning
Where possible, water is cleaned through a bypass into our mobile filtration unit while the loop keeps running. Sections that need isolating are cleaned during your planned shutdown.
- 5
Demineralisation and refill
The water is demineralised and the system topped up with treated water, with reference to VDI 2035 and the water-quality requirements of your equipment manufacturers.
- 6
Results and handover
We sample the water again and hand over a report covering the method, the results before and after, and recommendations for ongoing monitoring.
What you get
Process and HVAC heating and cooling loops
We work on closed-loop heating and cooling systems, including low-temperature hot water (LTHW) and chilled water (CHW) circuits serving air handling units, clean-room HVAC, fan coils and process equipment through plate heat exchangers.
We don't work on product-contact or purified water systems such as purified water or water for injection. Our work stays on the closed heating and cooling side of your utilities.
- •LTHW and CHW circuits
- •AHU and clean-room HVAC heating and cooling coils
- •Plate heat exchangers and plant-room distribution pipework
- •Process heating and cooling loops (closed systems)
Shutdown planning
Many pharmaceutical sites work to fixed annual or periodic shutdowns. We plan the work well in advance so that the parts that need isolating are ready to go when the window opens, and as much as possible is done beforehand while the system is live.
- •Pre-shutdown survey and water sampling
- •Side-stream filtration while the system runs, to reduce the work left for the shutdown
- •Isolation and cleaning of agreed sections during the shutdown
- •Post-shutdown sampling to confirm the result
The documentation we provide
We know a GMP site needs a paper trail. You can expect the following, adapted to your site's own templates where needed.
- •Method statement and risk assessment (RAMS) for approval before work starts
- •Completed site induction and permit-to-work paperwork
- •Water analysis results before and after the work
- •A list of equipment used, and safety data sheets for any treatment products
- •A written completion report with recommendations for ongoing monitoring
Frequently asked questions
Do you work within our change control and validation procedures?
Yes. We provide the method statements, risk assessments and records your quality and engineering teams need to assess the work, and nothing is changed on a system until it has been approved through your procedures.
Can the work be done without a full shutdown?
Often, much of it can. Side-stream filtration cleans the water while the loop keeps running. Where a section has to be isolated, we plan it into your shutdown window.
Do you work on purified water or product-contact systems?
No. We work on closed heating and cooling loops, such as LTHW and chilled-water circuits, and not on purified water, water for injection or other product-contact systems.
Do you use cleaning chemicals?
In most cases no chemicals are needed, because the cleaning is done by filtration and magnetic separation. If a heavily fouled section needs a treatment product, we agree it with you in advance and supply the safety data sheet.
Do you work outside the South East?
Yes. We carry out commercial and industrial system cleaning and water treatment anywhere in Ireland.
Download our guides
Free PDFs to read now or keep for later.
Further reading
Request a site survey or quote
Tell us about the site and the system. Only the starred fields are required; the rest help us scope the job.
We use your details only to reply to your enquiry and, if you go ahead, to carry out the work. We won't add you to a mailing list. See our privacy policy.